Frequently Asked Questions
The Last Planner System manages short-term commitments between trades through pull planning, lookaheads and weekly plans. Takt Planning sets a steady rhythm by moving trades through zones at a fixed pace. LPS is about reliable promises. Takt is about flow.
Neither is better in every case. CPM is strong at logic and contract dates. LPS is strong at coordinating trades and protecting near-term work. Many projects use CPM for the baseline and LPS for execution.
Yes. Research on residential projects in Ireland found that Takt complements the Last Planner System, with Takt providing rhythm and LPS providing commitments and constraint management.
Takt works best on repeatable work with a stable supply chain and little variability. It is less natural for one-off, irregular work or where deliveries and information are unpredictable.
Lean Touch Solutions provides LCI-registered Last Planner System training and Takt Planning training for contractors across Ireland, the UK and Europe.
In short:
CPM sets the dates, the Last Planner System protects the commitments and Takt Planning sets the rhythm. Ask three questions: is the work repeatable, is the supply chain stable, and do trades need to commit to each other? Then layer the methods rather than choosing one.