How to Run a Pull Planning Workshop: A Step-by-Step Guide for Construction Teams

Construction projects involve multiple teams, subcontractors, suppliers and specialists working together to achieve common project milestones. However, coordinating these activities effectively is not always straightforward. Traditional construction programmes are often developed by project planners and distributed to the teams responsible for delivering the work. Although these programmes provide an important overall direction, they do not always capture the practical knowledge, dependencies and challenges experienced by the people working on site.

What Is a Pull Planning Workshop?

What Are Lean Behaviours in Construction?

Lean behaviours are the habits behind the tools. They cover how leaders listen, how crews raise problems, and how a team reacts when something goes wrong.

A weekly planning board is a tool. Honest talk at that board about what is blocking the work is a behaviour. Without the second, the first is just a whiteboard.

Lean Tools vs Lean Behaviours

Tools tell people what to do. Behaviours tell people how to act while doing it. Teams that learn only the tools often see early gains that fade. Teams that build the behaviours too tend to keep the gains.

Why Lean Behaviours Matter in 2026

The industry is talking about this more. The 2026 LCI Congress has a track on shifting from applying lean to becoming a lean organisation, with themes such as leadership behaviours, trust and psychological safety.

New research backs it up. An LCI study of 282 US construction workers found that leadership behaviour shapes stress. Among workers who strongly believed management prioritises safety, 24% worried stress would harm their health. Among those who believed it does not, the figure was 71%. Read the LCI summary of the study for the detail.

One more finding is worth knowing. An academic study of lean projects in the US found workers felt psychologically safer on lean projects than on traditional ones. But it also found most workers did not feel fully safe on either, often because of workload and deadline pressure. There is room to improve everywhere.

7 Core Lean Behaviours for Construction Teams

1. Respect for People

Treat foremen and trades as the experts they are. Ask for their ideas before you decide. People support what they help to shape.

2. Psychological Safety

People raise problems early when they feel safe to do so. Thank the person who brings bad news. Never punish honesty.

3. Gemba Walking

Gemba means the real place, where the work happens. Leaders walk the work face on a regular rhythm, watch, and ask questions. It is how leaders earn trust with crews.

4. Go See, Ask Why, Show Respect

Look at the real situation first. Ask why until you find the cause, not a person to blame. Treat everyone with dignity while you do it.

5. Visual Communication

Make progress and problems visible to all. Daily huddle boards, constraint logs and lookahead displays replace long email chains and guesswork.

6. Learning Without Blame

When something goes wrong, ask what in the system allowed it. Do not ask whose fault it was. The first question gives you a fix. The second gives you silence.

7. The Daily Improvement Habit

Improvement should not wait for a workshop. Build small daily routines, such as a morning huddle and an end-of-shift reflection. A Kaizen Event then handles the bigger problems the daily habit uncovers.

seven core lean behaviours for construction teams infographic

A 30-Day Plan to Start Building Lean Behaviours

You don’t need a big programme. Start with four small habits and run them for a month.

  • Week 1 — The project leader does one 30-minute gemba walk, asks three open questions and writes nothing down in front of the crew
  • Week 2 — Start a 10-minute daily huddle at one work face, with one question: what could stop us today?
  • Week 3 — Hold one blameless review of a recent issue, focused on the system and not the person
  • Week 4 — Ask the crew what to improve, pick one idea, try it, and share the result with everyone

Pair this with a regular Last Planner® System huddle, and a tidy workspace from 6S Methodology, so the habits have a visible home.

Common Mistakes to Avoid

  • Training the crew but not the leaders, who set the tone
  • Treating gemba walks as inspections instead of listening time
  • Reacting to bad news with blame, which teaches people to stay quiet
  • Running lean as an event instead of a daily routine
  • Leaving no internal champion to keep the habits going after the consultant leaves

Getting Started with Lean Behaviours in Ireland

Lean Touch Solutions has supported contractors across Ireland, the UK and Europe with lean behaviours and wider lean construction training since 2012. Our LCI-registered trainers start with a culture diagnostic, then coach leaders and crews on your own live project. See our Lean Behaviours service or the Lean Behaviours Training Course. You can also use Direct Observation to see how work really happens today. Book a free 30-minute consultation to talk through where to start.

Frequently Asked Questions

Lean behaviours are the daily habits of leaders and crews that make lean tools work, such as listening to the frontline, going to see the work, raising problems early and learning without blame.

Teams often learn the tools but leaders keep their old habits. When leaders blame, work from the office or treat improvement as an occasional event, lean gains fade.

A gemba walk is a regular visit by a leader to the place where work happens. The aim is to watch, listen and ask questions in order to understand problems first-hand, not to inspect or blame.

It is the shared belief that people can raise problems, admit mistakes and ask questions without fear of blame. It helps teams surface risks early, before they become incidents.

Lean Touch Solutions provides LCI-registered lean behaviours training and coaching for contractors across Ireland, the UK and Europe.

In short:

Lean tools give you a method. Lean behaviours keep it alive. Respect your crews, make it safe to raise problems, walk the work, learn without blame and improve a little every day. Start with the 30-day plan and build from there.

Picture of Lean Touch Editorial Team

Lean Touch Editorial Team

Founded in 2012, our Team has partnered with clients across Europe to improve productivity through Lean Transformation, Behavioural Change, and Practical Tools.

Talk to Lean Expert

Free 30-minute consultation. No commitment required.